Lactation and babycare facility (Mum's Hub) at the University of Nairobi

UoN Mum's Hub will provide accessible and safe space at the University of Nairobi's Main Campus for lactating students and staff to successfully combine study and work with breastfeeding. 
The Hubs will incorporate and demonstrate green building principles including the use of reclaimed and biobased materials. 
We welcome you to support the construction of UoN Mum's Hub through your in-kind donation of materials and labor or through cash donations.


List of materials needed
Item Q. Needed Q. Received Q. Pending Total Cost(KES) Action
Hardcore 12 Tonne(s) 1 Tonne(s) 11 Tonne(s) 8,800 donate
Murram 4 Tonne(s) 0 Tonne(s) 4 Tonne(s) 2,000 donate
Gladiator 5 Litre(s) 0 Litre(s) 5 Litre(s) 22,500 donate
Water proofing- Damp Proof Course, 20m by 1.0m 2 Roll(s) 0 Roll(s) 2 Roll(s) 2,700 donate
Cement 93 50kg Bag(s) 0 50kg Bag(s) 93 50kg Bag(s) 60,450 donate
Riversand 17 Tonne(s) 0 Tonne(s) 17 Tonne(s) 37,400 donate
Ballast 17 Tonne(s) 0 Tonne(s) 17 Tonne(s) 37,400 donate
binding wire- 25kg Roll 1 Roll(s) 0 Roll(s) 1 Roll(s) 3,600 donate
9 " /200mm coral natural Stones 372 Piece(s) 0 Piece(s) 372 Piece(s) 20,460 donate
Marine plywood 1.2mm wide x2.4mm high (4' by 8') 6 Piece(s) 0 Piece(s) 6 Piece(s) 19,200 donate
8inches by 1 inch timber 166 Metre(s) 0 Metre(s) 166 Metre(s) 33,200 donate
Timber ( formwork)- 4inch ordinary timber nails 1 50kg Bag(s) 0 50kg Bag(s) 1 50kg Bag(s) 7,500 donate
Timber (formwork) 2inch ordinary timber nails 1 50kg Bag(s) 0 50kg Bag(s) 1 50kg Bag(s) 7,500 donate
paint 15 Litre(s) 0 Litre(s) 15 Litre(s) 12,300 donate
1000 Gauge DPM- 2.1m wide 32 Metre(s) 0 Metre(s) 32 Metre(s) 3,200 donate
12mm Dia bars, 12m long 28 Piece(s) 0 Piece(s) 28 Piece(s) 36,400 donate
10mm Dia bars, 12m long 12 Piece(s) 0 Piece(s) 12 Piece(s) 10,080 donate
Steel Mesh Fabric -A142 2m wide x 45m long Roll 1 Roll(s) 0 Roll(s) 1 Roll(s) 33,000 donate
Bamburi portland cement 93 50kg Bag(s) 0 50kg Bag(s) 93 50kg Bag(s) 65,100 donate
Lime Bags 18 25 Kg Bag(s) 0 25 Kg Bag(s) 18 25 Kg Bag(s) 10,080 donate
20 Gauge x 25 mm wide hoop iron 6 Roll(s) 0 Roll(s) 6 Roll(s) 21,600 donate
9" Machine cut stones 1044 Piece(s) 0 Piece(s) 1044 Piece(s) 88,740 donate
6" Machine cut stones 965 Piece(s) 0 Piece(s) 965 Piece(s) 53,075 donate
4" Machine cut stones 620 Piece(s) 0 Piece(s) 620 Piece(s) 27,900 donate
Parmanent ventilation 43 Number(s) 0 Number(s) 43 Number(s) 16,340 donate
8mm Dia bars, 12m long 12 Piece(s) 0 Piece(s) 12 Piece(s) 6,720 donate
100x50mm rafters 68 Linear Metre(s) 0 Linear Metre(s) 68 Linear Metre(s) 17,000 donate
75 x 50mm purlins 279 Linear Metre(s) 0 Linear Metre(s) 279 Linear Metre(s) 61,380 donate
28 Gauge 1075x 1000mm standard galvanized corrugated roofing sheets covering 275 Piece(s) 0 Piece(s) 275 Piece(s) 265,375 donate
horse shoe 300 mm long 32 Number(s) 0 Number(s) 32 Number(s) 19,200 donate
100 mm diameter rain water downpipe 4 Linear Metre(s) 0 Linear Metre(s) 4 Linear Metre(s) 1,200 donate
800 mm swan neck 4 Number(s) 0 Number(s) 4 Number(s) 1,200 donate
200 x 600 x 8mm thick Engineered Laminated Bamboo 101 Square Metre(s) 0 Square Metre(s) 101 Square Metre(s) 161,600 donate
1200x2400mm by 9.5mm Gypsum boards 109 Piece(s) 0 Piece(s) 109 Piece(s) 146,060 donate
Gyproc gypsum filler 25kg 26 25 Kg Bag(s) 0 25 Kg Bag(s) 26 25 Kg Bag(s) 41,600 donate
Gypsum cornice 4nch by 8ft 84 Piece(s) 0 Piece(s) 84 Piece(s) 46,200 donate
Gypsum Screws 100 Box(s) 0 Box(s) 100 Box(s) 60,000 donate
Channels 322 Linear Metre(s) 0 Linear Metre(s) 322 Linear Metre(s) 77,280 donate
Ceramic tiles 72 Box(s) 0 Box(s) 72 Box(s) 171,360 donate
2 Lever mortice lock and set furniture Ref.Union 5 Number(s) 0 Number(s) 5 Number(s) 14,000 donate
100mm x 76 x 2.50 Brass butt hinges 9 Piece(s) 0 Piece(s) 9 Piece(s) 2,700 donate
40mm Diameter rubber door stops 8 Number(s) 0 Number(s) 8 Number(s) 2,240 donate
Window overall size 920 x 1450 mm high 13 Number(s) 0 Number(s) 13 Number(s) 169 donate
Window overall size 4000 x 1500mm high 2 Number(s) 0 Number(s) 2 Number(s) 162,000 donate
Window overall size 4000 x 1000 mm high 13 Number(s) 0 Number(s) 13 Number(s) 702,000 donate
Window overall size 1500 x 1200mm high 2 Number(s) 0 Number(s) 2 Number(s) 48,600 donate
Window overall size 1200 x 1200 mm high 3 Number(s) 0 Number(s) 3 Number(s) 131,220 donate
Window overall size 600 x 600mm high 2 Number(s) 0 Number(s) 2 Number(s) 27,000 donate
25 mm diameter double brass curtain rod 180 Linear Metre(s) 0 Linear Metre(s) 180 Linear Metre(s) 162,000 donate
40FT containers 2 Number(s) 0 Number(s) 2 Number(s) 960,000 donate
20FT containers 4 Number(s) 0 Number(s) 4 Number(s) 1,200,000 donate
Wash hand basin 3 Number(s) 0 Number(s) 3 Number(s) 84,000 donate
WC suite 2 Number(s) 0 Number(s) 2 Number(s) 76,000 donate
Shower fitting 2 Number(s) 0 Number(s) 2 Number(s) 50,000 donate
Kitchen fittings 2 Number(s) 0 Number(s) 2 Number(s) 60,000 donate
Tilet roll holder 2 Number(s) 0 Number(s) 2 Number(s) 5,000 donate
Soap dish 2 Number(s) 0 Number(s) 2 Number(s) 5,000 donate
mirror size 600 x 450mm 2 Number(s) 0 Number(s) 2 Number(s) 4,000 donate
20mm diameter x 700mm long chromium plated towel rail 2 Number(s) 0 Number(s) 2 Number(s) 5,000 donate
5000 litre capacity water tank 1 Number(s) 0 Number(s) 1 Number(s) 65,000 donate
sundries 1 SUM(s) 0 SUM(s) 1 SUM(s) 85,000 donate
Fitting 1 SUM(s) 0 SUM(s) 1 SUM(s) 120,000 donate
Silk vinyl emulsion paint as "Crown " 36 Litre(s) 0 Litre(s) 36 Litre(s) 29,520 donate
Plastic emulsion paint as "Crown " 3 coats 21 Litre(s) 1 Litre(s) 20 Litre(s) 16,400 donate

List of materials received
Donor Item Quantity Value(KES) Delivery Status
Nickson Otieno Handle-Stainless steel door LHT-RR-009-PSS 1 Number(s) 800 delivered
Felix Auka Handle-Stainless steel door LHT-RR-009-PSS 1 Number(s) 800
Felix Auka Handle-Door level handle set( Brassware) 1 Number(s) 4500
Felix Auka Handle-Stainless steel door LHT-RR-009-PSS 2 Number(s) 1600
Nickson Otieno Bathroom accessories-Tapis Jeals bib cock top CP 1 Number(s) 820 delivered
Felix Auka Handle-Stainless steel door LHT-RR-009-PSS 1 Number(s) 800
Nickson Otieno Handle-Round Ornamental cupboard (Aluminium) 1 Number(s) 650
Felix Auka Handle-Round Ornamental cupboard (Aluminium) 1 Number(s) 650
Felix Auka Handle-Stainless steel door LHT-RR-009-PSS 1 Number(s) 800
Felix Auka Handle-Stainless steel door LHT-RR-009-PSS 1 Number(s) 800
Felix Auka Handle-Stainless steel door LHT-RR-009-PSS 1 Number(s) 800
Felix Auka Handle-Cupboard door handles ( Brassware) 1 Number(s) 500
Felix Auka Handle-100 mm D pull(Aluminum) 2 Number(s) 2700
Felix Auka Handle-Cupboard door handles ( Brassware) 1 Number(s) 500
Felix Auka Hardcore 1 Tonne(s) 800
Nickson Otieno Plastic emulsion paint as "Crown " 3 coats 20 Litre(s) 16400
Nickson Otieno Hardcore 1 Tonne(s) 800
Nickson Otieno Hardcore 1 Tonne(s) 800
Nickson Otieno Cement 20 50kg Bag(s) 13000
Nickson Otieno Hardcore 3 Tonne(s) 2400
Nickson Otieno Hardcore 2 Tonne(s) 1600
Labour Schedule
Name Q. Needed Q. Received Q. Pending Total Cost (KES)
Site clearance 4 day(s) 0 day(s) 4 day(s) 2,600
Mason/Bricklayer/stone-mason 3 day(s) 0 day(s) 3 day(s) 3,600
Semi -skilled labour 3 day(s) 0 day(s) 3 day(s) 1,800
Steel fixer 3 day(s) 0 day(s) 3 day(s) 3,600
Semi -skilled labour 24 day(s) 0 day(s) 24 day(s) 14,400
Steel fixer 2 day(s) 0 day(s) 2 day(s) 2,400
Helper/semi skilled labour 2 day(s) 0 day(s) 2 day(s) 1,200
Painter 1 day(s) 0 day(s) 1 day(s) 1,200
Semi-skilled(helper) 1 day(s) 0 day(s) 1 day(s) 600
Carpenter 1 day(s) 0 day(s) 1 day(s) 1,200
Mason/finisher 2 day(s) 0 day(s) 2 day(s) 2,400
Helper/semi skilled labour 16 day(s) 0 day(s) 16 day(s) 9,600
Carpenter 1 day(s) 0 day(s) 1 day(s) 1,200
Semi -skilled labour 4 day(s) 0 day(s) 4 day(s) 2,400
Steel fixer 4 day(s) 0 day(s) 4 day(s) 4,800
Semi -skilled labour 8 day(s) 0 day(s) 8 day(s) 4,800
Mason/Bricklayer/stone-mason 8 day(s) 0 day(s) 8 day(s) 9,600
Semi -skilled labour 8 day(s) 0 day(s) 8 day(s) 4,800
Mason/Bricklayer/stone-mason 8 day(s) 0 day(s) 8 day(s) 9,600
Mason/Bricklayer/stone-mason 8 day(s) 0 day(s) 8 day(s) 9,600
Semi -skilled labour 8 day(s) 0 day(s) 8 day(s) 4,800
Mason/Bricklayer/stone-mason 4 day(s) 0 day(s) 4 day(s) 4,800
Semi -skilled labour 4 day(s) 0 day(s) 4 day(s) 2,400
Mason/Bricklayer/stone-mason 4 day(s) 0 day(s) 4 day(s) 4,800
Semi -skilled labour 4 day(s) 0 day(s) 4 day(s) 2,400
Mason/finisher 4 day(s) 0 day(s) 4 day(s) 4,800
Semi -skilled labour 4 day(s) 0 day(s) 4 day(s) 2,400
Carpenter 10 day(s) 0 day(s) 10 day(s) 12,000
Semi -skilled labour 20 day(s) 0 day(s) 20 day(s) 12,000
Carpenter 20 day(s) 0 day(s) 20 day(s) 24,000
Semi -skilled labour 20 day(s) 0 day(s) 20 day(s) 12,000
Carpenter 2 day(s) 0 day(s) 2 day(s) 2,400
Semi -skilled labour 2 day(s) 0 day(s) 2 day(s) 1,200
Painter 4 day(s) 0 day(s) 4 day(s) 4,800
Semi -skilled labour 2 day(s) 0 day(s) 2 day(s) 1,200
Carpenter 1 day(s) 0 day(s) 1 day(s) 1,200
Carpenter 2 day(s) 0 day(s) 2 day(s) 2,400
Semi -skilled labour 3 day(s) 0 day(s) 3 day(s) 1,800
Carpenter 2 day(s) 0 day(s) 2 day(s) 2,400
Semi -skilled labour 2 day(s) 0 day(s) 2 day(s) 1,200
Mason/finisher 12 day(s) 0 day(s) 12 day(s) 14,400
Semi -skilled labour 12 day(s) 0 day(s) 12 day(s) 7,200
Painter 12 day(s) 0 day(s) 12 day(s) 14,400
Semi -skilled labour 12 day(s) 0 day(s) 12 day(s) 7,200
Mason/finisher 6 day(s) 0 day(s) 6 day(s) 7,200
Semi -skilled labour 6 day(s) 0 day(s) 6 day(s) 3,600
Mason/finisher 15 day(s) 0 day(s) 15 day(s) 18,000
Semi -skilled labour 15 day(s) 0 day(s) 15 day(s) 9,000
Mason/Bricklayer/stone-mason 8 day(s) 0 day(s) 8 day(s) 9,600
Semi -skilled labour 8 day(s) 0 day(s) 8 day(s) 4,800
Painter 8 day(s) 0 day(s) 8 day(s) 9,600
Semi -skilled labour 8 day(s) 0 day(s) 8 day(s) 4,800
Mason/finisher 1 day(s) 0 day(s) 1 day(s) 1,200
Semi -skilled labour 1 day(s) 0 day(s) 1 day(s) 600
Mason/finisher 6 day(s) 0 day(s) 6 day(s) 7,200
Semi -skilled labour 6 day(s) 0 day(s) 6 day(s) 3,600
carpenter 4 day(s) 0 day(s) 4 day(s) 4,800
Semi -skilled labour 6 day(s) 0 day(s) 6 day(s) 3,600
Mason/finisher 1 day(s) 0 day(s) 1 day(s) 1,200
Semi -skilled labour 5 day(s) 0 day(s) 5 day(s) 3,000
Mason/finisher 4 day(s) 0 day(s) 4 day(s) 4,800
Semi -skilled labour 24 day(s) 0 day(s) 24 day(s) 14,400
Mason/finisher 8 day(s) 0 day(s) 8 day(s) 9,600
Semi -skilled labour 24 day(s) 0 day(s) 24 day(s) 14,400
Mason/finisher 2 day(s) 0 day(s) 2 day(s) 2,400
Semi -skilled labour 8 day(s) 0 day(s) 8 day(s) 4,800
Mason/finisher 1 day(s) 0 day(s) 1 day(s) 1,200
Semi -skilled labour 4 day(s) 0 day(s) 4 day(s) 2,400
Mason/finisher 1 day(s) 0 day(s) 1 day(s) 1,200
Semi -skilled labour 2 day(s) 0 day(s) 2 day(s) 1,200
Mason/finisher 1 day(s) 0 day(s) 1 day(s) 1,200
Mason/finisher 1 day(s) 0 day(s) 1 day(s) 1,200
Semi -skilled labour 4 day(s) 0 day(s) 4 day(s) 2,400

Labour Donation Received
# Donor Labour Quantity(days) Value(KES)
1 Felix Auka Site clearance 3 1950
2 Felix Auka Semi -skilled labour 1 600
3 Felix Auka Carpenter 1 1200

Want to help?

You can donate cash or materials to this noble project.

Donation Progress

Material

Total Material Cost
KES: 5,735,169

Labour

Total Labour Cost
KES: 392,600

Latest Updates

This project has no progress updates

Project Location