Reading and Dining Spaces (ReaDine) at Sigoti Complex Girls Secondary School

Sigoti Complex Girls Secondary School is an Extra-County public girls’ boarding
a secondary school located in Sigoti Location of Upper Nyakach division of
Kisumu County, about 7Km off Kisumu-Sondu-Kisii highway.

The school was established in 1999 purely as a community initiative to improve access to education for girls. The institution operated as a day school up to 2007 when it became a boarding school. The school has since realized rapid development in terms of student population due to the introduction of Free Primary Education and Free Day Secondary Education programmes. However, the development of the physical infrastructure of the school has been gradual and not commensurate with the population growth.

Rapid growth in the student population exerts significant pressure on existing facilities, thereby causing serious congestion which affects the quality of education. The current enrollment of 1,200 students is twice the number that the existing infrastructure can accommodate optimally.


List of materials needed
Item Q. Needed Q. Received Q. Pending Total Cost(KES) Action
Murram 155 Tonne(s) 0 Tonne(s) 155 Tonne(s) 77,500 donate
Termido 96 SC pesticide 10 Litre(s) 0 Litre(s) 10 Litre(s) 20,000 donate
Riversand 47 Tonne(s) 0 Tonne(s) 47 Tonne(s) 103,400 donate
Cement 279 50kg Bag(s) 0 50kg Bag(s) 279 50kg Bag(s) 181,350 donate
Ballast 39 Tonne(s) 0 Tonne(s) 39 Tonne(s) 85,800 donate
Mild Steel reinforcement-12 mm diameter 33 Piece(s) 0 Piece(s) 33 Piece(s) 36,300 donate
binding wire- 25kg Roll 8 Roll(s) 0 Roll(s) 8 Roll(s) 28,800 donate
Bricks - 6 inches or 150mm 8360 Piece(s) 0 Piece(s) 8360 Piece(s) 0 donate
10000 litres plastic water tanks 8 Number(s) 0 Number(s) 8 Number(s) 0 donate
Polyester membrane from recycled plastics 33 Number(s) 0 Number(s) 33 Number(s) 0 donate
Premium quality weather proof paint as "Crown Permaplast" 73 Litre(s) 0 Litre(s) 73 Litre(s) 0 donate
Marine plywood 1.2mm wide x2.4mm high (4' by 8') 12 Piece(s) 0 Piece(s) 12 Piece(s) 38,400 donate
Paving blocks 23200 Piece(s) 0 Piece(s) 23200 Piece(s) 0 donate
Water proofing- Damp Proof Course, 20m by 1.0m 191 Roll(s) 0 Roll(s) 191 Roll(s) 257,850 donate
20 Gauge x 25 mm wide hoop iron 3 Roll(s) 0 Roll(s) 3 Roll(s) 10,800 donate
Timber (formwork)- Wood planks approximate size (3000mmx200x20mm) 360 Piece(s) 0 Piece(s) 360 Piece(s) 0 donate
Door- Salvaged flush door(2100x900mm) 33 Number(s) 0 Number(s) 33 Number(s) 0 donate
20mm thick blockboard (for lockers) 172 Square Metre(s) 0 Square Metre(s) 172 Square Metre(s) 0 donate
Timber (formwork) 2inch ordinary timber nails 1 50kg Bag(s) 0 50kg Bag(s) 1 50kg Bag(s) 7,500 donate
Timber ( formwork)- 4inch ordinary timber nails 1 50kg Bag(s) 0 50kg Bag(s) 1 50kg Bag(s) 7,500 donate
PPR/HDPE drain pipe 165 Linear Metre(s) 0 Linear Metre(s) 165 Linear Metre(s) 0 donate
200mm diameter GI support stand 232 Linear Metre(s) 0 Linear Metre(s) 232 Linear Metre(s) 0 donate
48.5X5.0mm Lateral supports 777 Linear Metre(s) 0 Linear Metre(s) 777 Linear Metre(s) 0 donate

List of materials received
Donor Item Quantity Value(KES) Delivery Status
Labour Schedule
Name Q. Needed Q. Received Q. Pending Total Cost (KES)
No labour schedule for this project

Labour Donation Received
# Donor Labour Quantity(days) Value(KES)
There is no labour donation for this project

Want to help?

You can donate cash or materials to this noble project.

Donation Progress

Material

Total Material Cost
KES: 855,200

Labour

Total Labour Cost
KES: 0

Latest Updates

This project has no progress updates

Project Location